Supercell Billet Compressor Wheel for 2001-2004 Duramax LB7 RHG6 Turbocharger - High Performance Upgrade for Diesel Trucks & Towing Applications
Supercell Billet Compressor Wheel for 2001-2004 Duramax LB7 RHG6 Turbocharger - High Performance Upgrade for Diesel Trucks & Towing Applications
Supercell Billet Compressor Wheel for 2001-2004 Duramax LB7 RHG6 Turbocharger - High Performance Upgrade for Diesel Trucks & Towing Applications
Supercell Billet Compressor Wheel for 2001-2004 Duramax LB7 RHG6 Turbocharger - High Performance Upgrade for Diesel Trucks & Towing Applications
Supercell Billet Compressor Wheel for 2001-2004 Duramax LB7 RHG6 Turbocharger - High Performance Upgrade for Diesel Trucks & Towing Applications

Supercell Billet Compressor Wheel for 2001-2004 Duramax LB7 RHG6 Turbocharger - High Performance Upgrade for Diesel Trucks & Towing Applications

$82.49 $149.99 -45% OFF

Free shipping on all orders over $50

7-15 days international

30 people viewing this product right now!

30-day free returns

Secure checkout

19797963

Guranteed safe checkout
amex
paypal
discover
mastercard
visa
apple pay

Description

Supercellturbos billet compressor wheel for 01-04 Duramax LB7. Turbo Model: RHG6 Year: 2001-2004 GTX style 11+0 blades

Features

    Drop-In upgrade billet compressor wheel, no modifications needed.

    GTX 11+0 style blades design.

    Fit Turbo Model RHG6

    Fit Vehicle 2001-2004 Duramax LB7

Reviews

******
- Verified Buyer
All in all it was worth doing. It lowered my EGTs ( about 160 cooler ) and spool up time. I’d recommend doing a wastegate before this upgrade because even with a banks big head, it pushes significantly more boost and it’s nice to be able to adjust how much psi you want.The wheel fit too tightly on the shaft at first but after some polishing with a scotch bright pad on the shaft it slid right on.It's moving a lot more air now. My air filter is pulled upwards towards the turbo. An aftermarket air box will be my next purchaseIf you haven’t pulled your turbo off before, plan on a 1-2 day job. It took me 18 hours from start to finish.